Waha Oil Company, Benghazi
Faregh Phase 2 Gas Processing Facility
Libya

HP & LP Fuel Gas KO Drums & Closed Drain Drum

The Waha Faregh Phase II Project included the development of a facility to take gas reserves contained in a number of gas caps and, following treatment, to export the resultant sales gas via the gas pipeline being constructed in Phase I. 180 MMSCFD of gas is planned to be exported at 1100 psig. We were commissioned to design and manufacture one high pressure fuel gas knock out drum, one low pressure fuel gas knock out drum (both skid mounted) and a closed drains drum.

Our scope of work included full process & mechanical/electrical engineering with design calculations and drawings. All design codes and specifications were in accordance with ASME Section VIII and ‘U’ Stamped.

HP Fuel Gas KO Drum: Size = 770 Ø x 2,600mm length with a design pressure of 36.3 barg to operate within pressure range of 20 - 26.3 Barg.

LP Fuel Gas KO Drum: Size = 610 Ø x 2,700mm length with a design pressure of 6.3 barg, operating pressure 4.5 Barg.

Closed Drains Drum: Size = 2,286 Ø x 10,668mm Tan to Tan Length, Total Weight when empty 13,000kg with a design pressure of 3.5 Barg.