Ostrava, Czech Republic – PSA Switching Valve Skid
BC-MCHZ Hydrogen Plant
Czech Republic

This project included the manufacture, assembly, painting, E&I installation and shipment of the client’s free issue equipment to their specification.

Specification required random 10% MPI of structure, main beams and lifting points with a piping test requirement of NDT, 10% (100% of 10% of all welds) hydro-test to all pipe spools.

Measuring 14m x 3.4m x 3m and weighing nearly 18 tons, the surface preparation and painting required SA 25 blast clean and a 3-coat, 2-pack coating system.